Halfway Done! – Peaks 6 and 7
Posted on July 13th, 2009 by sarah_hassell
This morning the team set out at 3:00 am for peaks 6 and 7 for a combined total of 5,600 vertical feet and 11.25 miles round trip. Mt. Shavano, 14,229 ft, was summited at 7:30 am and Tabegauche Peak at 14,155 ft was completed at 9:15 am. The team is camping tonight with Mt. Antero on the agenda tomorrow.